BVG Berlin - Berlin Network

60 x 50 cm
Delivered between Mon, 22.6. and Fri, 26.6.
More than 10 pieces in stock at third-party supplier
Supplied by
Free shipping starting at 50.–

Sizes6

Product details

Poster BVG Berlin - Network Map Berlin

With the network map of the Berlin Transport Company, you can get an overview of all U-Bahn and S-Bahn lines in Berlin. Keep the color-coded overview of public transport always in sight and decorate with the popular line map of the capital.

The poster is available in various sizes.

Key specifications

Frame colour
None
Frame material
None
Picture type
Poster
Image features
without feature
Width
60 cm
Height
50 cm

General information

Item number
14949207
Manufacturer
BVG
Category
Pictures
Manufacturer No.
WA256738
Release date
2.3.2021

Colour

Colour
Grey
Exact colour description
Grey
Frame colour
None

Material

Material group
Paper
Material
Paper
Frame material
None

Picture properties

Picture type
Poster
Picture motif
TownsTravel
Artist
Unknown
Image features
without feature

Scope of delivery

Items per sales unit
1x
Scope of delivery
1x poster

Origin

Country of origin
Germany

Voluntary climate contribution

CO₂ emissions
1.89 kg
Climate contribution
CHF 0.11

Product dimensions

Format
60 x 50 cm
Width
60 cm
Height
50 cm
Thickness
0.10 cm
caliber
LandscapeRectangular

30-day right of return
24 Months Warranty (Bring-in)

Compare products

Goes with

Reviews & Ratings

Warranty score

How often does a product of this brand in the «Pictures» category have a defect within the first 24 months?

Source: Digitec Galaxus
  • BVG
    Not enough data
  • 1.ABYstyle
    0 %
  • 2.Luckies
    0.2 %
  • 2.Trenddeko
    0.2 %
  • 4.GB Eye
    0.3 %

Warranty case duration

How many working days on average does it take to process a warranty claim from when it arrives at the service centre until it’s back with the customer?

Source: Digitec Galaxus
  • BVG
    Not enough data
  • 1.Wallxpert
    0 days
  • ABYstyle
    Not enough data
  • ChiCura
    Not enough data
  • GB Eye
    Not enough data

Return rate

How often is a product of this brand in the «Pictures» category returned?

Source: Digitec Galaxus
  • BVG
    Not enough data
  • 1.GB Eye
    0.2 %
  • 2.ABYstyle
    0.3 %
  • 3.Luckies
    0.5 %
  • 4.Pyramid
    1.1 %
Source: Digitec Galaxus