ABL Wallbox (Type 2, 11 kW, 16 A, Type 2)
CHF439.–

ABL Wallbox

Type 2, 11 kW, 16 A, Type 2


Question about ABL Wallbox

avatar
Lewis1200

1 year ago

Can I connect in single phase? French instructions ?

Avatar
avatar
robertfrei

1 year ago

Hi Lewis. Yes, you can also operate the wallbox with 1 phase. However, make sure that the internal charge controller (connected to the FI) is also on this phase. Please also note that the wallbox requires an installation permit from your network operator (EW). Only specialist companies (installation tax) may install the wallbox.

avatar
Anonymous

1 year ago

I don't think so. Three-phase current is necessary.