Integrierte Abwassersanierung und Voraussetzungen der Erfindung
Artem Viktorovich Gerasimov, 2021More than 10 items in stock at supplier
Product details
The wastewater treatment system includes an electrolytic reactor with a first chamber, a second chamber, and piping. The first chamber is designed to collect incoming wastewater. The second chamber has a pair of electrodes configured to generate an electric field. The piping connects the first chamber to the second chamber. The system is designed so that the flow of wastewater through the electric field is essentially laminar. The treatment plant also includes a precious metal extraction facility as well as various filtration and sedimentation equipment, including a semipermeable envelope filter.
Author | Artem Viktorovich Gerasimov |
Book cover | Paperback |
Year | 2021 |
Item number | 56194128 |
Publisher | Unser Wissen |
Category | Reference books |
Release date | 11.3.2025 |
Author | Artem Viktorovich Gerasimov |
Year | 2021 |
Book cover | Paperback |
Year | 2021 |
CO₂-Emission | |
Climate contribution |
Compare products
Goes with
Reviews & Ratings
Warranty score
How often does a product of this brand in the «Reference books» category have a defect within the first 24 months?
Source: Digitec Galaxus- Unser WissenNot enough data
- 1.Anaconda0 %
- 1.Ariston0 %
- 1.Avery Publishing Group0 %
- 1.Beltz0 %
Warranty case duration
How many working days on average does it take to process a warranty claim from when it arrives at the service centre until it’s back with the customer?
Source: Digitec Galaxus- Unser WissenNot enough data
- AnacondaNot enough data
- AristonNot enough data
- Avery Publishing GroupNot enough data
- Beck C.H.Not enough data
Unfortunately, we don't have enough data for this category yet.
Return rate
How often is a product of this brand in the «Reference books» category returned?
Source: Digitec Galaxus- Unser WissenNot enough data
- 1.Beltz0 %
- 1.Bertelsmann C.0 %
- 1.Econ0 %
- 1.Eulogia0 %