E-Bidding For UAE Construction Industry
German, Irfan Zafar, 2017Product details
"E-Bidding for the UAE Construction Industry" is a comprehensive guide that addresses the specific requirements and challenges of the bidding process in the construction industry of the United Arab Emirates. The author, Irfan Zafar, provides valuable insights into the strategies and techniques necessary to succeed in an ever-changing business environment. The guide highlights the importance of selecting a suitable contractor and the role of the bidding process as a critical factor for the success of construction projects. By analyzing pricing and the communication between clients and bidders, it establishes a clear framework for conducting effective bidding processes. This book is a valuable resource for professionals working in the construction industry who wish to expand their knowledge in the area of e-bidding.
Language | German |
Author | Irfan Zafar |
Book cover | Paperback |
Year | 2017 |
Item number | 55892779 |
Publisher | Lap Lambert Academic |
Category | Guidebooks |
Release date | 11.3.2025 |
Language | German |
Author | Irfan Zafar |
Year | 2017 |
Book cover | Paperback |
CO₂-Emission | |
Climate contribution |
Compare products
Goes with
Reviews & Ratings
Warranty score
How often does a product of this brand in the «Guidebooks» category have a defect within the first 24 months?
Source: Digitec Galaxus- Lap Lambert AcademicNot enough data
- 1.Albin Michel0 %
- 1.Allegria0 %
- 1.Anaconda0 %
- 1.Another Me0 %
Warranty case duration
How many working days on average does it take to process a warranty claim from when it arrives at the service centre until it’s back with the customer?
Source: Digitec Galaxus- Lap Lambert AcademicNot enough data
- 1.AT0 days
- 1.Penguin Random House0 days
- Abrams & ChronicleNot enough data
- AdacNot enough data
Return rate
How often is a product of this brand in the «Guidebooks» category returned?
Source: Digitec Galaxus- Lap Lambert AcademicNot enough data
- 1.Adac0 %
- 1.Aris0 %
- 1.Baedeker0 %
- 1.BLV0 %