LOKI-Spezial Nr. 41
German, 2017Delivered between Thu, 10.7. and Sat, 12.7.
More than 10 pieces in stock at supplier
More than 10 pieces in stock at supplier
Free shipping starting at 50.–
Product details
From the beginnings of electrification to today's power supply. Development from the Seebach-Wettingen test track to the Gotthard Base Tunnel. Richly illustrated. Excerpt from the contents: Electrification in the early days Electrification of the railroad lines Power stations of the SBB Sub and converter stations Catenaries and power signals Power supply today.
Language | German |
Number of pages | 132 |
Book cover | Paperback |
topic | Leisure & Travelling |
Year | 2017 |
Item number | 14425292 |
Publisher | Stämpfli |
Category | Guidebooks |
Release date | 6.7.2017 |
topic | Leisure & Travelling |
Language | German |
Year | 2017 |
Number of pages | 132 |
Edition | 1 |
Book cover | Paperback |
CO₂-Emission | |
Climate contribution |
Height | 290 mm |
Width | 210 mm |
Weight | 431 g |
Specifications may include unverified machine translations.
30-day right of return if unopened
24 Months Warranty (Bring-in)
1 additional offer
Compare products
Goes with
Reviews & Ratings
Warranty score
How often does a product of this brand in the «Guidebooks» category have a defect within the first 24 months?
Source: Digitec Galaxus- StämpfliNot enough data
- 1.Albin Michel0 %
- 1.Anaconda0 %
- 1.Another Me0 %
- 1.Ansata0 %
Warranty case duration
How many working days on average does it take to process a warranty claim from when it arrives at the service centre until it’s back with the customer?
Source: Digitec Galaxus- StämpfliNot enough data
- 1.AT0 days
- 1.Penguin Random House0 days
- Abrams & ChronicleNot enough data
- AdacNot enough data
Return rate
How often is a product of this brand in the «Guidebooks» category returned?
Source: Digitec Galaxus- StämpfliNot enough data
- 1.Adac0 %
- 1.Aris0 %
- 1.BLV0 %
- 1.Callwey0 %
Source: Digitec Galaxus